← All world modelsProcess controlOfficial simulator · retrospectiveA08 Labsv0.3.2
a08/pc-gym-four-tank-control
PC-Gym Four-Tank Controller
Predict coupled tank levels and rank pump schedules against live level targets and overflow constraints.
Private preview · advisory runtime only
Plan quality100%
Mean regret0
Exact full-plan match100%
Recorded trajectory p9517.71 ms
Recorded planning p951176.23 ms
Training sourcePC-Gym 0.1.8 · four_tank
Training transitions5,120
Held-out H12 error0.07%
Held-out improvement94.26%
Interactive package
Change the context. Compare the plans.
The local runtime evaluates candidate control sequences, predicts their trajectories and rejects plans outside the declared envelope.
Set the current telemetry, choose a goal and run the planner.
Results include actions, predicted state and constraint checks.World contract
Official PC-Gym four-tank environment with two coupled pump inputs and adjustable level targets.
Temporal unit: 0.5_seconds. Supported horizons: 1, 4, 8, 12, 20.
StateTank 1 level0 to 0.6 m
Tank 2 level0 to 0.6 m
Tank 3 level0 to 0.6 m
Tank 4 level0 to 0.6 m
Tank 1 target0.08 to 0.5 m
Tank 2 target0.08 to 0.5 m
ActionsHold balanced pumpshold balanced
Raise tank 1raise tank 1
Raise tank 2raise tank 2
Raise both levelsraise both
Trim tank 1trim tank 1
Trim tank 2trim tank 2
Controlled draindrain controlled
Cross-balance to tank 1cross balance 1
Cross-balance to tank 2cross balance 2
GoalsTrack both level targets4 declared targets
Recover low tank levels4 declared targets
Constraintstank 1 overflowcritical · lte 0.56
tank 2 overflowcritical · lte 0.56
lower tank dryhard · gte 0.025
lower tank 4 dryhard · gte 0.025
Package record
Everything required to inspect and run this world.
Package digestsha256:ed0c33a8dbfb0dfd7448b99b7380744260cd124316954bce06e70cf30a95007d
world.jsonScope, lineage and runtime contract
model artifact25630 parameter transition profile
schemas/State, action and goal validation
eval/36 registered cases and result digest
Evidence boundaryThe corrected v0.3.1 planning metric reuses previously opened v0.2 cases and is not a fresh sealed confirmation.
Declared limitationsTrained and evaluated on PC-Gym 0.1.8 four_tank trajectories, not a physical plant.The package models the declared four-level state and two pump inputs only.Pump schedules are advisory. A plant safety system must retain execution authority.