A08Labs
← All world models
Process controlOfficial simulator · retrospectiveA08 Labsv0.3.2

a08/pc-gym-four-tank-control

PC-Gym Four-Tank Controller

Predict coupled tank levels and rank pump schedules against live level targets and overflow constraints.

Private preview · advisory runtime only
Plan quality100%
Mean regret0
Exact full-plan match100%
Recorded trajectory p9517.71 ms
Recorded planning p951176.23 ms
Training sourcePC-Gym 0.1.8 · four_tank
Training transitions5,120
Held-out H12 error0.07%
Held-out improvement94.26%

Interactive package

Change the context. Compare the plans.

The local runtime evaluates candidate control sequences, predicts their trajectories and rejects plans outside the declared envelope.

Live runtime

Plan from system state

Observed stateValues observed at H0
Control contextGoal parameters held across the rollout
Planner search49 candidates · H16
Hold balanced pumpsRaise tank 1Raise tank 2Raise both levelsTrim tank 1Trim tank 2Controlled drainCross-balance to tank 1Cross-balance to tank 2

Set the current telemetry, choose a goal and run the planner.

Results include actions, predicted state and constraint checks.

World contract

Official PC-Gym four-tank environment with two coupled pump inputs and adjustable level targets.

Temporal unit: 0.5_seconds. Supported horizons: 1, 4, 8, 12, 20.

State
Tank 1 level0 to 0.6 m
Tank 2 level0 to 0.6 m
Tank 3 level0 to 0.6 m
Tank 4 level0 to 0.6 m
Tank 1 target0.08 to 0.5 m
Tank 2 target0.08 to 0.5 m
Actions
Hold balanced pumpshold balanced
Raise tank 1raise tank 1
Raise tank 2raise tank 2
Raise both levelsraise both
Trim tank 1trim tank 1
Trim tank 2trim tank 2
Controlled draindrain controlled
Cross-balance to tank 1cross balance 1
Cross-balance to tank 2cross balance 2
Goals
Track both level targets4 declared targets
Recover low tank levels4 declared targets
Constraints
tank 1 overflowcritical · lte 0.56
tank 2 overflowcritical · lte 0.56
lower tank dryhard · gte 0.025
lower tank 4 dryhard · gte 0.025

Package record

Everything required to inspect and run this world.

Package digestsha256:ed0c33a8dbfb0dfd7448b99b7380744260cd124316954bce06e70cf30a95007d
world.jsonScope, lineage and runtime contract
model artifact25630 parameter transition profile
schemas/State, action and goal validation
eval/36 registered cases and result digest
Evidence boundary

The corrected v0.3.1 planning metric reuses previously opened v0.2 cases and is not a fresh sealed confirmation.

Declared limitationsTrained and evaluated on PC-Gym 0.1.8 four_tank trajectories, not a physical plant.The package models the declared four-level state and two pump inputs only.Pump schedules are advisory. A plant safety system must retain execution authority.